Working with the main developer for a site overlooking the iconic Headingly Ground in Leeds we designed, manufactured and installed furniture for the bedrooms and common areas including kitchenettes. High gloss White laminates were chosen by the client and all bedroom furniture was designed to be durable and contemporary looking.
Spread over 3 floors and with 58 bedrooms the project was completed in c 2 months from ordering to final installation. Also supplied was gym/workout equipment and soft seating with outdoor furniture on the roof terrace for the students to appreciate the Leeds weather!
Developers, architects and operators should you require help with schemes please get in touch.
We use cookies to provide you with the best possible experience. They also allow us to analyze user behavior in order to constantly improve the website for you.